Type 997 transition joint fittings for HDPE to steel pipe

Style 997 transition coupling hdpe plastic to steelProduct Description Features:   iron grooved coupling  1) Material: ductile cast iron ASTM-A536  2) Reducing installation costs  3) Flexibility and rigidity  4) Joint reliability  5) Isolate noise and vibratio

Featured Products

Style 997 transition coupling hdpe plastic to steel

Product Description
 
Features:   iron grooved coupling
 
 1) Material: ductile cast iron ASTM-A536
 
 2) Reducing installation costs
 
 3) Flexibility and rigidity
 
 4) Joint reliability
 
 5) Isolate noise and vibration
 
 6) Convenient joint
 
 7) Application: Power plant; Heating,ventilation and air conditioning; Industrial plant; Water treatment; Plumbing; Fire protection; Mining and mine processing; Oil field; Marine. This kind of coupling is designed for the pipe bearing moderate pressure. It allows controlled angle, linear and rotational movement at each joint and provides the added advantages of expansion, contraction and deflection. This is usful to accommodate uneven laying surfaces, and movement from thermal changes, setting, seismic effect or other causes. Flexible coupling can be used in fire protection system, feed water, gas system and etc.
 
Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe


Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe


Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe
Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe
Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe


 
Size Sheet 
Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe






About us

 Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe

 Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe

Product Process

Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe

Our Certificate

Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe

Packaging and Shipment

Pipe Fittings Style 997 Transition Coupling for HDPE-to-Steel Pipe

FAQ

 
Q: Are you trading company or manufacturer?
A: We are a factory.
Q: How long is your delivery time?
A: Generally 15 days after the down payment. OEM 30 to 90 days.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. 
Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.


CONTACT US:

Ms. Coco
Overseas Marketing Manager 
 
WeiFang ChangLe JiXiang Casting Factory
Shandong Junyue International Trade Co., Ltd.
 
 
 
 
 




 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours